Analysis and Control Measures for Low Oxygen Content in Capacity Electricity Pricing Test of 1000MW Thermal Power Generation Unit
In order to adapt to the development of new energy and promote the transformation of coal-fired power to both basic and regulated power sources,ensuring the safety and stability of the power system.On January 1,2024,Jiangsu Province officially implemented the capacity electricity price compensation mechanism.In order to ensure that the maximum output meets the standard,each unit must have the ability to operate at full capacity.However,due to long-term operation,Unit 2 suffers from low oxygen levels during summer,which has a certain impact on the safety of the unit.Through this article,combined with the actual situation,control measures are proposed to provide reference for the full output standard call of the unit.
capacity electricity pricestandard callsafe and stableoxygen content