Discussion on the Supervision Work of Urban Rail Transit Weak Current System Design Liaison Meeting Stage
Design liaison meeting is an important link in the construction process of urban rail transit weak current system.It is a prerequisite for the supervision engineer to make clear the supervision task at this stage and actively participate in the design liaison meeting.Based on the practical experience in the supervision process of the weak current system of urban rail transit,this paper sorted out some common problems encountered in the supervision process,discussed and proposed the main tasks of supervision in the design liaison meeting stage,in order to guide and reference the supervision work of the supervision engineers of the weak current system equipment.
Ex ante controlUrban rail transitWeak current systemDesign liaison meeting