Suggestions on Stability Evaluation and Treatment Measures of Excavated Rock Slope at Garbage Compression Transfer Station in West Luzhou City
The permanent rock slope will be formed after the excavation of the garbage compression transfer station in west Luzhou City,which is mostly exposed to the surface.Through comprehensive investigation,such as data collection,drilling,measurement,sampling,in-situ testing and investigation,combined with design requirements,the geotechnical parameters,qualitative and quantitative evaluation are proposed to identify the stability of the slope,and a comprehensive evaluation method for the stability of the excavated rock slope is proposed.The development trend is predicted,reasonable suggestions are suggested to reduce the project risk,and the stability evaluation of permanent rock slope is discussed.
rock slopesouth Sichuan regionstabilitycalculated working condition