川西南某金矿尾矿库稳定性评价研究

扫码查看
通过现场勘查及室内试验,并基于二维有限元分析软件GeoStudio室内数值模拟,对川西南某金矿尾矿库进行渗流、应力应变和稳定性研究分析.结果表明:①尾矿库堆积坝孔隙水压力从上到下逐渐增大,正常工况最大为864.98kPa,最小为-173.27kPa,洪水工况最大为874.49kPa,最小为-182.27kPa.②正常运行时,堆积尾矿向水平方向最大沉积位移25 cm,竖直最大沉积位移28 cm;洪水运行时,堆积尾矿向水平方向最大沉积位移34 cm,竖直最大沉积位移35 cm.③尾矿坝在正常工况、洪水工况下和特殊工况三种工况条件下运行时,稳定性计算结果均满足规范要求.
Study on Stability Evaluation of a Gold Mine Tailings Reservoir in Southwest Sichuan Province
Through field investigation and indoor tests,and based on two-dimensional finite element analysis software GeoStudio,indoor numerical simulation,the seepage,stress strain,and stability of a gold mine tailings pond in southwestern Sichuan were studied and analyzed.The results show that:(l)The pore water pressure increases gradually from top to bottom,with the maximum value of 864.98kPa and the minimum value of-173.27kPa under normal conditions.The maximum value of 874.49kPa and the minimum value of-182.27kPa under flood conditions.(2)During normal operation,the maximum horizontal displacement of tailings is 25 cm and the maximum vertical displacement is 28 cm.When the flood is running,the maximum horizontal displacement of tailings is 34 cm,and the maximum vertical displacement is 35 cm.(3)When the tailings dam operates under three operating conditions,normal,flood,and special,the stability calculation results meet the requirements of the specifications.

tailings reservoirseepagestress and deformationstability analysis

杨帆、张锐、陈宇、郑志威、陈世华

展开 >

四川省地质矿产勘查开发局区域地质调查队,成都 610213

四川省容大矿业集团有限公司,成都 610213

四川省容大鹏程建设工程有限公司,成都 610213

地质灾害防治与地质环境保护国家重点实验室,成都理工大学,成都 610059

展开 >

尾矿库 渗流 应力和变形 稳定性分析

2024

四川地质学报
四川省地质学会

四川地质学报

影响因子:0.314
ISSN:1006-0995
年,卷(期):2024.44(3)