扫码查看
针对现阶段煤矿总平面布置方案比选工作中存在的指标体系片面、主观因素过强等不足,提出了基于"全要素指标体系"的总平面方案比选理论.以神木市呼家塔煤矿的总平面方案比选为例,定义全要素指标体系的概念,并以此为理论基础,建立呼家塔煤矿总平面方案全要素集合,再应用层次分析法、模糊综合评价法等数学模型,对呼家塔煤矿各总平面布置方案进行评价,得出最优方案.
Comparison and Selection of Coal Mine General Drawing Schemes Based on Total Factor Indicator System
Aiming at the shortcomings of one-sided indicator system and strong subjective factors in the current stage of comparison and selection work of coal mine general drawing schemes,a theory of general drawing scheme comparison and selection based on the"total factor"indicator system is proposed.Taking the general drawing scheme comparison and selection of Hujiata Coal Mine as an example,the concept of the total factor indicator system is defined,and based on this,a collection of total factor of the general drawing scheme of Hujiata Coal Mine is established.Then,mathematical models such as Analytic Hierarchy Process(AHP),Fuzzy Comprehensive Evaluation and others are applied to evaluate the general drawing scheme of Hujiata Coal Mine,and the optimal scheme is obtained.

coal enterprisegeneral layouttotal factorAnalytic Hierarchy Process(AHP)fuzzy evaluation

王元

展开 >

中煤西安设计工程有限责任公司,陕西 西安 710054

煤炭企业 总平面布置 全要素 层次分析法 模糊评价

2024

山东煤炭科技
山东省煤炭学会

山东煤炭科技

影响因子:0.185
ISSN:1005-2801
年,卷(期):2024.42(1)