首页|永红煤矿小煤柱沿空掘巷围岩控制技术应用研究

永红煤矿小煤柱沿空掘巷围岩控制技术应用研究

扫码查看
针对永红煤矿工作面之间留设较宽煤柱时巷道因应力集中而破坏严重及资源浪费的问题,通过理论分析和数值模拟等方法,研究了沿空掘巷覆岩结构特征,提出小煤柱巷道围岩非对称耦合支护技术.研究表明,3306 运输顺槽合理煤柱宽度为 9 m,采用高强加长锚杆索对顶板和煤柱帮进行强力支护,有效控制巷道底鼓和非对称变形难题;掘进期间巷道变形不明显,回采期间顶底板收缩最大586 mm、两帮收缩最大972 mm,巷道围岩变形可控,说明强力支护技术对小煤柱巷道的控制有效,确保了工作面安全回采,也为相似条件下工程实践提供技术参考.
Research and Application of Surrounding Rock Control Technology for Small Coal Pillar Roadway Excavation Along Goaf in Yonghong Coal Mine
Aiming at the problem of severe damage and resource waste caused by stress concentration in the roadway when relatively wide coal pillars are left between the working faces of Yonghong Coal Mine,the structural characteristics of the overlying rock of the roadway excavation along goaf are studied through theoretical analysis and numerical simulation,and an asymmetric coupling support technology for the small coal pillar roadway surrounding rock is proposed.The research shows that the reasonable coal pillar width for the 3306 transportation channel is 9 m;Using high-strength extended anchor rod cables for strong support of the roof and coal pillar sides,effectively controlling the difficult problem of roadway floor heave and asymmetric deformation;During the excavation period,the deformation of the roadway is not significant.During the stoping period,the maximum shrinkage of the roof and floor is 586 mm,and the maximum shrinkage of the two sides is 972 mm.The deformation of the roadway surrounding rock is controllable,indicating that the strong support technology is effective in controlling the small coal pillar roadway,ensuring the safe stoping of the working face and providing technical reference for engineering practice under similar conditions.

along goafsmall coal pillarsupportasymmetric

裴陆慧

展开 >

山西沁和能源集团永红煤矿,山西 沁水 048205

沿空 小煤柱 支护 非对称

2024

山东煤炭科技
山东省煤炭学会

山东煤炭科技

影响因子:0.185
ISSN:1005-2801
年,卷(期):2024.42(2)
  • 10