首页|采区水仓快速综掘施工技术与研究

采区水仓快速综掘施工技术与研究

扫码查看
为确保陈四楼煤矿采区接替平稳过渡,需要加快十八采区水仓施工进度尽快完成采区永久排水系统,以便为后续回采巷道正常进行掘进提供安全保障.十八采区水仓由于受水仓容量和泵房位置的限制,需要多次连续拐弯施工.为加快巷道施工进度同时解决水仓连续大角度拐弯无法实现连续出矸的难题,陈四楼煤矿尝试采用"综掘机+耙装机+胶带输送机"连续出矸方案,通过不断尝试和优化形成了陈四楼煤矿采区水仓快速综掘施工技术体系,平均月单进达 120 m以上.结合陈四楼煤矿十八采区水仓施工过程,从工程设计、设备选型、施工方法等方面详细介绍了采区水仓快速综掘施工技术体系,为以后相似工程提供了技术参考.
Research on Rapid Comprehensive Excavation Construction Technology for Water Sump in Mining Area
To ensure a smooth transition of mining area succession in Chensilou Coal Mine,it is necessary to accelerate the construction progress rate of the water sump in the 18th mining area and complete the permanent drainage system of the mining area as soon as possible,in order to provide safety guarantee for the normal excavation of subsequent stoping roadways.Due to the limitations of water sump capacity and pump room location in the 18th mining area water sump,which requires multiple continuous turning constructions.In order to accelerate the progress rate of roadway construction and simultaneously solve the difficult problem of continuous large angle turning of the water sump unable to achieve continuous gangue discharge,Chensilou Coal Mine attempts to adopt the"comprehensive excavation machine+rake loading machine+rubber belt conveyor"continuous gangue discharge scheme.Through continuous experimentation and optimization,a rapid comprehensive excavation construction technology system for the water sump in the mining area of Chensilou Coal Mine is formed,with an average monthly single advance of over 120 m.Combined with the construction process of the water sump in the 18th mining area of Chensilou Coal Mine,this paper provides a detailed introduction to the rapid comprehensive excavation construction technology system of the water sump in the mining area from the aspects of engineering design,equipment selection,construction methods and so on,providing technical reference for similar engineerings in the future.

mining area water sumprapid comprehensive excavationconstructioncontinuous gangue discharge

宋道

展开 >

河南龙宇能源股份有限公司陈四楼煤矿,河南 永城 476600

采区水仓 快速综掘 施工 连续出矸

2024

山东煤炭科技
山东省煤炭学会

山东煤炭科技

影响因子:0.185
ISSN:1005-2801
年,卷(期):2024.42(5)