为解决工作面穿越断层构造区支护失效、片帮、局部顶板冒落等问题,以济宁二号煤矿133上03 综采工作面为工程背景,采用数值模拟研究了工作面穿越断层过程中上覆岩层的演变规律,得出随着工作面距断层的距离减小,剪切应力先逐渐减小、后增大,正应力先逐渐增大、后减小的变化规律,且距断层10~30 m区域应加强顶板支护;同时,注浆可降低应力集中的现象,可有效控制工作面过断层围岩的变形破坏.综采工作面过断层破碎带控制措施通过现场工业试验,验证了该方案的可行性.
Research and Application of Surrounding Rock Control Technology for Fully Mechanized Mining Face Passing Through Fault Fracture Zone
In order to solve the problems of support failure,wall caving,local roof collapse and so on when the working face crosses the fault structure area,taking the 133upper03 fully mechanized mining face of Jining No.2 Coal Mine as the engineering background,numerical simulation is used to study the evolution law of the overlying rock layer during the process of the working face crossing the fault.The variation law is concluded that as the distance between the working face and the fault decreases,the shear stress gradually decreases first and then increases,and the normal stress gradually increases first and then decreases,and roof support should be strengthened in the area 10-30 m away from the fault;meanwhile,grouting can reduce the phenomenon of stress concentration and effectively control the deformation and failure of the surrounding rock passing through faults in the working face.Through the on-site industrial test,the feasibility of the scheme is verified by the control measures of the fully mechanized mining face passing through the fault fracture zone.

fully mechanized miningfaultgroutingcontrol

刘庭、支帅

展开 >

兖矿能源集团股份有限公司济宁二号煤矿,山东 济宁 272100

综采 断层 注浆 控制