首页|基于现有结构扩容改造泵房的优化设计研究

基于现有结构扩容改造泵房的优化设计研究

扫码查看
受限于海塘管理规定等因素,邻江雨水泵房扩容仅能依托现有结构及穿堤管线.为充分挖掘泵房排水潜能、确保排水设施安全稳定运行,以上海罗泾港区雨水泵房的扩容改造设计为例,利用 CFD软件对泵房进水池流态进行仿真模拟,分析进水流量增大对整体流态、典型截面速度分布的影响,提出吸入口底部增设防旋板的优化方案,并对流态改善效果进行验证.结果表明,泵房能力扩容增加了底部漩涡形成风险,易造成泵组偏心振动;增设防旋板后水泵进水口流态得到明显改善,有利于保障和改善泵组运行稳定性,推动实现排水能力最大化提升.可为泵房扩容改造工程优化设计提供参考.
Optimization Design on Expansion Project of Pumping Station Based on Existing Structure
The expansion project of rainwater pumping station which adjacent to the Yangtze River is limited by sev-eral factors,such as Regulations on Seawall Management.As a result,the expansion project must be based on the exist-ing structure and crossing-dyke drainage pipelines.How to realize its full potential and ensure the safe and stable opera-tion of pumps,taking the expansion project of rainwater pumping station for the Luojing Port Area in Shanghai for an ex-ample,The CFD was used for flow pattern analysis of puming station.The influence of flow increase on intake sump is assessed,including the flow pattern in intake sump and section velocity distributions.The optimization scheme of anti-ro-tation plate was proposed,and the effect of flow pattern control was analyzed.It is found that an increased risk of the vortex formation is associated with the water flow increase,which might give rise to eccentric vibration.It turns out that anti-rotation plate indicates a significant rectification effect on pump inlet,which might be benefitted to ensure secure-and-reliable operation,and maximize the capacity of drainage system.The research results can provide a reference for the op-timal design of pumping station expansion projects.

submersible axial-flow pumpexpansion projectexisting structurenumerical simulationflow pattern analysisvortex

杨粤茗、唐玮、王浩冉

展开 >

中交水运规划设计院有限公司, 北京 100007

潜水轴流泵 扩容 现有结构 数值模拟 流态分析 漩涡

2024

水电能源科学
中国水力发电工程学会 华中科技大学 武汉国测三联水电设备有限公司

水电能源科学

CSTPCD北大核心
影响因子:0.525
ISSN:1000-7709
年,卷(期):2024.42(3)
  • 8