首页|基于四元联系数集对分析的河湖长制建设效果评价

基于四元联系数集对分析的河湖长制建设效果评价

扫码查看
为科学评价河湖长制建设成效,从水资源管理、水域岸线管理、水工程建设管理、水污染防治、水环境治理、执法与组织实施 6 个方面选取 20 个指标构建河湖长制建设效果评价指标体系.选用序关系法确定主观权重,熵权法确定客观权重,通过乘数合成法组合主客观权重求得最终权重,构建基于四元联系数集对分析评价模型.利用该模型对辽宁省 14 个设区市 2022 年河湖长制建设效果进行评价.结果表明,总体上辽宁省河湖长制建设效果落实情况较好.大连、鞍山、抚顺、营口和朝阳实施效果最好;盘锦总体评价等级最低,与其他地区差距较大.
Evaluation of Construction Effect of River and Lake Chief System Based on Quaternionic Linkage Number Set-pair Analysis
In order to scientifically evaluate the effect of the construction of the river and lake chief system,20 indica-tors were selected to build an indicator system from aspects of water resources management,waterside shoreline manage-ment,water project construction and management,water pollution prevention and control,water environment manage-ment,law enforcement and organisation and implementation.Sequential relationship method(G1)is chosen to determine the subjective weights.Entropy weight method(EWM)is used to determine the objective weights.The final weights are obtained by combining the subjective and objective weights through the multiplicative synthesis method,so as to construct an evaluation model based on quaternionic linkage number set-pair analysis.The model was used to evaluate the effect of the construction of the river and lake chief system in 14 district cities in Liaoning Province in 2022.The results show that the implementation of the effect of the construction of the river and lake chief length system in Liaoning Province was good on the whole.Dalian,Anshan,Fushun,Yingkou and Chaoyang had the best implementation.Panjin had the lowest overall evaluation rating,with a large gap between it and the other regions.

river and lake chief systemconstruction effect evaluationquaternionic linkage numberset-pair analysisLiaoning Province

王硕、唐德善、杨艳慧

展开 >

河海大学水利水电学院,江苏 南京 210098

辽宁省河库管理服务中心(辽宁省水文局),辽宁 沈阳 110003

河湖长制 建设效果评价 四元联系数 集对分析 辽宁省

国家重点研发计划

2017YFC0405805-04

2024

水电能源科学
中国水力发电工程学会 华中科技大学 武汉国测三联水电设备有限公司

水电能源科学

CSTPCD北大核心
影响因子:0.525
ISSN:1000-7709
年,卷(期):2024.42(5)
  • 7