首页|海勃湾水库库区淤积及排沙运用指标分析

海勃湾水库库区淤积及排沙运用指标分析

扫码查看
为了减缓水库淤积,延长海勃湾水库的使用寿命,对水库运行以来库区的淤积情况和排沙运用指标进行分析.对库区纵向和横向淤积形态分析可知,库区淤积主要在前坡段和顶坡段,而且前坡段和顶坡段高程1 075 m以上的滩地已开始出现淤积;海勃湾库区泥沙淤积主要集中在排沙期 7~10 月,2014~2020 年排沙期淤积泥沙占总淤积量的 66%.高程 1 074 m 以下是淤积的主体,淤积泥沙 2.01×108 m3,占总淤积量的95%.顶坡段断面D7~D20 淤积量为 1.82×108 m3,占总淤积量的 83%,是淤积的主要库段;确定排沙时段为 7~10 月;确定排沙量级为 1 500 m3/s以上,但对于平枯水年可选 1 200 m3/s 以上进行排沙;确定排沙起始含沙量为 2 kg/m3 以上可降低水位排沙;确定排沙期(7~10 月份)的排沙调度水位控制在 1 071~1 075 m,但当有合适的水沙条件时,可降低水位至死水位 1 069 m 或以下进行敞泄排沙.通过对海勃湾水库库区淤积和排沙运用指标的分析,可参考这些排沙运用指标进一步制定详细的排沙调度方案.
Analysis of Sedimentation and Sediment Discharge Application Index in Haibowan Reservoir Area
In order to slow down the sedimentation and prolong the service life of Haibowan Reservoir,the sedimen-tation and sediment discharge indexes of the reservoir area since the operation of the reservoir are analyzed.According to the analysis of the longitudinal and transverse siltation patterns in the reservoir area,the siltation in the reservoir area is mainly in the front slope section and the top slope section,and the beach above 1 075 m in the front slope section and the top slope section has begun to silt up.The sediment deposition in the Haibowan reservoir area is mainly concentrated in the sediment discharge period from July to October,and the sediment deposition in the sediment discharge period from 2014 to 2020 accounts for 66%of the total deposition.The main body of siltation is below the elevation of 1 074 m,and the siltation sediment is 201 million m3,accounting for 95%of the total siltation.The deposition amount of D7-D20 in the top slope section is 182 million m3,accounting for 83%of the total deposition amount,which is the main reservoir section of deposition.The sand discharge period is determined to be from July to October.It is determined that the mag-nitude of sediment discharge is more than 1 500 m3/s,but more than 1 200 m3/s can be selected for sediment discharge in normal and dry years.It is determined that the initial sediment concentration of sediment discharge is more than 2 kg/m3,which can reduce the water level sediment discharge,and the water level of sediment discharge scheduling from July to October is 1 071-1 075 m.But when there are suitable water and sediment conditions,the water level can be re-duced to 1 069 m or below the dead water level for open discharge and sediment discharge.Through the analysis of the sedimentation and sediment discharge operation indexes in the reservoir area of Haibowan Reservoir,the detailed sedi-ment discharge operation scheme can be further formulated with reference to these sediment discharge operation indexes.

Haibowan Reservoirsiltation formsedimentation distributionsediment

郭静怡、李新杰、王远见、王强

展开 >

河海大学水利水电学院,江苏 南京 210098

水利部黄河下游河道与河口治理重点实验室,河南 郑州 450003

黄河水利科学研究院,河南 郑州 450003

海勃湾水库 淤积形态 淤积分布 泥沙

国家自然科学基金项目国家自然科学基金项目国家自然科学基金项目国家重点研发计划

U224323651879115U22432152021YFC3200400

2024

水电能源科学
中国水力发电工程学会 华中科技大学 武汉国测三联水电设备有限公司

水电能源科学

CSTPCD北大核心
影响因子:0.525
ISSN:1000-7709
年,卷(期):2024.42(6)