Discussion on Construction Planning of Modern Water Grid in Heze
Heze Municipality suffers the prominent bottlenecks and shortcomings restricting the ability of water security,such as the uneven distribution of water resources,the imperfect water resources engineering deployment and utilization system,the insufficient flood control capacity of some river channels and the delerioration of water ecological environment.To this end,by promoting the construction of modern water grid,it has taken actions of integrated optimal allocation of water resources and guaranteed supply pattern,which is conducive to improving the layout of basin flood control engineering system,effectively improving river and lake ecological protection ability and water security risk prevention and control ability,coordinating the solution of new and remaining water problems,and furthermore to scientifically plan the construction and layout of water grid,and provide more solid water security guarantee for the high-quality development of regional economy and society.
Heze MunicipalityModern water gridWater resourcesFlood control and drainage