Soft Foundation Treatment Technology and Application for Hydraulic Structures in Yellow River Coastal Area in Shandong
The coastal area along the Yellow River in Shandong Province is located in the lower reaches of the Yellow River,mostly in the alluvial fan plain.Soft soil foundation is a common difficult problem in the construction of hydraulic structures in this area.Foundation treatment often determines the safe and effective operation of the structure.Therefore,scientific and reasonable soft foundation treatment technology is the key to ensure foundation bearing capacity and con-trol foundation settlement.This paper analyzes the treatment measures of soft foundation in the construction of hydraulic structures with examples,and summarizes the key points of construction,which can be taken as the reference for similar projects.
Shandong ProvinceCoastal area along the Yellow RiverHydraulic structureSoft base treatment