Alignment Analysis of Water Level and discharge relationship at the test section of Laiwu Hydrology Station
Temporary curve method is a common one used to determine the relationship between water level and flow in hydrological stations.When using the legal line of temporary curve,there is a usual phenomenon of re-curving,and when determining multiple temporary curves,the flow of adjacent curves does not connect.Taking Laiwu Hydrology Station as an example,based on the measured water level and flow data in 2022,this paper puts forward some ideas and methods to eliminate the re-curve and make the adjacent curve flow joint.
Water level and flow relationshipTemporary curve methodre-curveJoint flow rateLaiwu Hydrology Station