南水北调东线一期北延应急供水工程衬砌施工

扫码查看
在南水北调东线一期工程北延应急供水工程施工中,为增加应急调水输水能力,同时保证渠道输水安全,在基本不增加原设计水位条件下提高了六分干的过流能力.本文简述了工程六分干渠道衬砌段施工流程及施工质量控制措施,总结了施工经验,提出建议对策,为类似项目施工提供借鉴.
Construction of the Lining Project for North Extension Emergency Water Supply Project(Phase Ⅰ)in the East Route of the South-to-North Water Diversion Project
In the construction of lining project for north extension emergency water supply Project(Phase Ⅰ)in the east route of the South-to-North Water Diversion Project,in order to increase the emergency water diversion capacity and ensure the safety of channel water transmission,the overflow capacity of Liufen main channel was improved without increasing the original design water level.This paper briefly describes the construction process and construction quality control measures of the lining section of the Liufen main channel of the project,summarizes the construction experience and puts forward suggestions to provide reference for the construction of similar projects.

Phase Ⅰ of the East Route of the South-to-North Water Diversion ProjectEmergency water supplyChannel water diversionLining construction

张笛、王庆帅

展开 >

山东大禹水务建设集团有限公司,山东 济南 250014

南水北调东线一期 应急供水 渠道输水 衬砌施工

2024

山东水利
山东省水利科学研究院

山东水利

影响因子:0.098
ISSN:1009-6159
年,卷(期):2024.(3)