首页|德州市徒骇河宫家节制闸施工导流方案比选

德州市徒骇河宫家节制闸施工导流方案比选

扫码查看
德州市徒骇河宫家节制闸经多年运行,损毁严重.除险加固工程施工期内为保证闸址上下游的灌溉用水需求,经综合比较后,选定分流结合全断面导流方案,不仅有效地解决了闸址上下游的灌溉用水要求,且来水经过各级分流后大大减小了闸址处河槽过流流量,降低了河槽及岸坡坍塌破坏风险系数,减少了工程量,节约了工程投资.
Comparative Selection of Construction Diversion Plans of Gongjia Regulating Gate on the Tuhai River in Dezhou
After years of operation,in the Gongjia regulating gate on the Tuhai River in Dezhou,it has suffered significant damage.In order to ensure the irrigation water demand upstream and downstream of the gate site during the construction period of the hazard removal and reinforcement project,a diversion plan combining partial and full cross-section diversion was selected following a comprehensive comparison.This approach not only effectively met the irrigation water requirements upstream and downstream but also significantly reduced the flow volume at the gate site by distributing the incoming water across several levels.This reduction in flow volume decreased the risk of river channel and bank slope collapse,reduced the volume of construction work,and saved on project costs.

Dezhou CityTuhai RiverGongjia regulating gateConstruction diversion

张超、栗瑞娟、任红燕

展开 >

山东省水利勘测设计院有限公司,山东济南 250014

山东水务招标有限公司,山东济南 250014

德州市 徒骇河 宫家节制闸 施工导流

2024

山东水利
山东省水利科学研究院

山东水利

影响因子:0.098
ISSN:1009-6159
年,卷(期):2024.(4)