Earth-rock dam is a water-retaining structure filled with local earth-rock materials,and its anti-seepage and drainage design is an important part of the reinforcement of reservoir.Taking Wujia Zhuangzibei Reservoir in Zhucheng City of Weifang Municipality as an example,this paper discusses the application of"high pressure swinging pile+slope drainage"technology in reservoir reinforcement engineering,summarizes the construction technology and attentions,which can provide reference for the similar reservoir reinforcement project.
关键词
吴家庄子北水库/高压摆喷桩/贴坡排水/大坝防渗
Key words
Wujia Zhuangzibei Reservoir/High pressure swinging spray pile/Slope drainage/Dam seepage control