跨流域调水工程泵站流量调节方式选择及应用
Selection and Application of Flow Regulation Mode of Pumping Station in inter-basin Water Diversion Project
张宁1
作者信息
- 1. 山东省水利综合事业服务中心,山东济南 250014
- 折叠
摘要
山东跨流域调水工程由引黄济青、胶东调水工程组成,文章介绍了跨流域调水工程全系统泵站流量调节的必要性,各泵站根据泵站机组实际情况,借鉴国内常见的机组流量调节方式,选择应用不同的流量调节方式,并取得了较好的实际效果.
Abstract
Water diversion project in Shandong is composed of two projects of water diversion from Yellow River to Qingdao,and water diversion to Jiaodong area.This paper introduces the necessity of flow regulation of the whole system pumping stations in Shandong water diversion project group.According to the actual situation of pumping station units,and learn from the domestic common flow regulation methods,each pumping station selects and applies different flow regulation methods,with practical achievements.
关键词
山东省/调水工程/泵站/流量调节Key words
Shandong Province/Water diversion engineering/Pumping station/Flow regulation引用本文复制引用
出版年
2024