提高大口径球墨铸铁管道安装效率的方法
Methods to Improve the Installation Efficiency of Large-caliber Nodular Cast Iron Pipelines
张智翔 1刘娟娟 2王伟伟3
作者信息
- 1. 威海广安城投置业有限公司,山东威海 264200
- 2. 商河县农业综合开发服务中心,山东商河 251600
- 3. 山东省科源工程建设监理中心,山东济南 250014
- 折叠
摘要
常规的球墨铸铁管道安装施工中,一般采用起重机吊管入沟,再用倒链进行管道安装,这种施工方法存在效率低、工期长、成本高的缺点.威海市河库水系连通工程施工中采用大功率挖掘机吊装、安装一次性管道施工工艺,具有效率高、成本低、质量高的特点,既能保证施工质量,又能提效降费.
Abstract
In the conventional installation and construction of nodular cast iron pipe,the crane is generally used to lift the pipe into the ditch,and then the pipe installation is carried out by the inverted chain.This construction method has the disadvantages of low efficiency,long construction period and high cost.The use of high-power excavator hoisting and installing disposable pipe construction technology in the construction of water connection among rivers and reservoirs project,has the characteristics of high efficiency,high quality and low cost,which can not only ensure the construction quality,but also improve efficiency and reduce costs.
关键词
威海市/水系连通/大口径/球墨铸铁管Key words
Weihai Municipality/Connection in water system/Large caliber/Nodular cast iron pipe引用本文复制引用
出版年
2024