Construction Technology of Bottom Plate Reinforcement of Tianjin Gaoyin 117 Building
Tianjin Gaoyin 117 building foundation slab has large size. Reinforcement fabric piece area is large and dense layer with many complicated embedded parts, which puts forward the big challenge of steel processing and steel brace system design. In accordance with the problems of the construction, firstly using the construction site reinforced centralized processing and uniform distribution automation of the production mode, which greatly improves the efficiency of steel processing and distribution, reduces the engineering cost. Secondly through technical research, the adoption steel pipe fastener type support as a base plate reinforced support system, carries on the optimization design of floor reinforced, improves the working efficiency, reduces the labor intensity, speeds up the construction speed, benefits the construction quality and time limit.