Design and Application of Hanging Steel Formwork Under Integral Lifting Platform
Core tube of Tianjin CTF Financial Center project tower building uses integral lifting platform to construct core tube wall,lifting platform hanging under the formwork system uses fixture construction steel formwork system,the lifting platform of the project is combined with the design of the platform,and the suspension beam is designed to effectively solve the problem of suspension and stress.Through the combination of steel and wood technology,with mold design,steel formwork fixture and many other technologies solve the project structure changeable,great change in the level of large,high requirement of formwork turnover times and so on.