公路盾构隧道联络通道建设面临较大的不确定性和风险,通常采用人工地层冻结法进行施工.以孟加拉吉大港卡纳普里河底盾构隧道联络通道为研究对象,分析联络通道施工过程中冻土帷幕和结构衬砌受力情况,研究采用双圈管冻结施工过程中冻土帷幕发展规律.针对施工期和运营期衬砌受力的最不利工况进行验算,分析积极冻结和维护冻结阶段温度场的变化,并研究部分不确定参数的敏感性.分析结果表明,该联络通道设计施工方案合理可行.
Simulation Analysis of Freezing Construction for the Cross Passage of Underwater Highway Shield Tunnel
The construction of the cross passages of twin shield tunnel is confronted with high uncertainty and huge risk.Artificial ground freezing method is widely used in the construction of cross passages.In this paper,cross passage construction under the River Karnaphuli Chittagong-Bangladesh which is proposed to be constructed by double-row-ring freezing method,is taken as the study object.The stress of the frozen soil and the internal force of the cross passage lining is calculated.The critical situations in construction and operation periods and the key mechanical parts are recognized and the safety of the design scheme is checked.The temperature field of frost wall during the active freezing period and the maintenance freezing period is calculated,and the sensitivity effects of some uncertain parameters are analyzed.The results show that the design and construction scheme of cross passage were reasonably practicable.

tunnelsshieldscross passagefreezing methodnumerical simulationstresstemperature field

张军、张立鹏、闫良涛、郑甲佳

展开 >

中交第二公路勘察设计研究院有限公司,湖北 武汉 430056

中交集团隧道与地下空间工程技术研发中心,湖北 武汉 430056

中国交建总承包经营分公司,北京 100088

中煤特殊凿井有限责任公司,安徽 合肥 230001

中煤矿山建设集团有限责任公司,安徽 合肥 230001

矿山深井建设技术国家工程研究中心,北京 100020

安徽省特殊凿井工程技术研究中心,安徽 合肥 230001

中国路桥工程有限责任公司,北京 100011

展开 >

隧道 盾构 联络通道 冻结法 数值模拟 应力 温度场

中交集团重点科技项目

KJFZ-2017-071

2024

施工技术(中英文)
亚太建设科技信息研究院 中国建筑设计研究院 中国建筑工程总公司 中国土木工程学会

施工技术(中英文)

影响因子:1.244
ISSN:2097-0897
年,卷(期):2024.53(3)
  • 14