Analysis of Mechanism and Application Research of Same-floor Grouting Technology for Sleeve Grounting Shear Wall
At present,it is not clearly stipulated that after the installation of the assembled shear wall,it is necessary to carry out the continuous operation of the steel sleeve grouting immediately.Therefore,the non-same floor grouting method,the same-floor grouting method,and the part of the same-floor grouting,the remaining part of the different floor grouting method are used to theoretically calculate and analyze the timing for prefabricated shear wall steel sleeve grouting.The overall process implementation,advantages and disadvantages of different construction methods are compared,and the quality test results are compared and studied.The advantages of the same-floor grouting technology in terms of safety,reliability and economy are proved by comparison of the comprehensive process flow,safety,quality and cost.