基于BIM技术的全生命周期数字交付管理研究

扫码查看
分析当前BIM应用现状,仍存在各阶段模型不能传递共享、无法一模到底;图纸与模型并行施工,图模不一致导致实际与模型不一致;在项目施工完成后,模型数据便被丢弃,未能对模型价值进行深度挖掘.为了有效解决以上问题,从数字交付物角度梳理了数字交付流程,并针对设计交付、施工交付、运维交付的要点进行了重点阐述.设计阶段需完成模型生产、基于模型的应用及模型监管,为后续应用奠定基础;施工阶段基于设计模型进行深化,基于BIM协同施工平台,满足项目的质量、安全、进度、资料等数字化管理;运维阶段引入数字孪生运维概念,通过物联网技术,在BIM运维平台中实现动态数据与静态数据的联动,实时反映项目运营状态.
Digital Delivery Management of Whole Life Cycle Based on BIM Technology
According to the analysis of the current BIM application status,there are still models at various stages that can not be passed and shared,and can not be exactly modeled.Drawing and model are constructed in parallel,and the inconsistency between drawing and model leads to the inconsistency between actuality and model.After the completion of the project,the model data is discarded,and the value of the model can not be deeply explored.In order to effectively solve the above problems,the digital delivery process is sorted out from the perspective of digital deliverables,and the key points of design delivery,construction delivery,operation and maintenance delivery are expounded.In the design stage,model production,model-based application and model supervision should be completed to lay the foundation for subsequent application.The construction phase is deepened based on the design model and BIM collaborative construction platform to meet the digital management of project quality,safety,progress and data.The concept of digital twin operation and maintenance is introduced in the operation and maintenance stage.Through the Internet of Things technology,dynamic data and static data are linked in the BIM operation and maintenance platform to reflect the project operation status in real time.

building information modeling(BIM)whole life cycledigital deliverymanagement

王志海、李兵

展开 >

江苏省公共工程建设中心有限公司,江苏 南京 210008

中通服咨询设计研究院有限公司,江苏 南京 210019

建筑信息模型 全生命周期 数字交付 管理

江苏省住房和城乡建设厅科研项目

2023ZD071

2024

施工技术(中英文)
亚太建设科技信息研究院 中国建筑设计研究院 中国建筑工程总公司 中国土木工程学会

施工技术(中英文)

影响因子:1.244
ISSN:2097-0897
年,卷(期):2024.53(6)
  • 14