随着地铁项目建设规模逐年增大,地铁车站深基坑施工项目也在大量兴建.半盖挖法施工是在地铁车站基坑施工过程中快速恢复地表交通、同时保证基坑正常开挖的有效措施.但半盖挖法施工过程中基坑钢支撑吊装一直是基坑支撑施工的难点.针对地铁车站深基坑半铺盖系统,提出了一种盖板下门式起重机吊装技术.同时依托实际工程经验,整理了吊装施工过程中各环节的关键技术要点.针对盖板下门式起重机吊装施工过程进行了风险分析,提出了应急处理措施.
Gantry Crane Hoisting Technique Employed Beneath Cover Plate in Semi-covering System of Subway Station Foundation Excavation
With the increasing scale of subway project construction year by year,a large number of deep foundation excavation construction projects for subway station are also under construction.The half-cover excavation method is an effective measure to quickly restore the surface traffic and ensure the normal excavation of the foundation excavation during the construction of the foundation excavation of the subway station.However,the hoisting of foundation excavation steel support during the construction using the half-cover excavation method has always been a difficulty in the construction of foundation excavation support.In accordance with the semi-covered system of deep foundation pits in subway stations,a lifting technology of gantry cranes under cover plates is proposed.Meanwhile,based on the practical engineering experience,the key technical points of each link in the hoisting construction process are sorted out.The risk analysis is carried out for the hoisting construction process of the gantry crane under the cover plate,and the corresponding emergency treatment measures are put forward.

subway stationsdeep foundation excavationsupportshalf-cover excavation methodhoistinggantry crane

范宜为

展开 >

中铁十八局集团第三工程有限公司,河北 涿州 072750

地铁车站 深基坑 支护 半盖挖法 吊装 门式起重机

中国铁建股份有限公司 2022年度科技研究开发计划及资助课题中铁十八局集团有限公司 2022年度科研创新项目

2022-C1C2022-051

2024

施工技术(中英文)
亚太建设科技信息研究院 中国建筑设计研究院 中国建筑工程总公司 中国土木工程学会

施工技术(中英文)

影响因子:1.244
ISSN:2097-0897
年,卷(期):2024.53(7)