Steel Structure Construction Technology of Maitreya Altar Project for Buddhist Academy of Zhejiang Phase Ⅱ
The steel structure engineering of Maitreya Altar project for Buddhist Academy of Zhejiang Phase Ⅱ is mainly composed of Longhuafa Hall,Xumi Mountain and Doulü Tiangong.The key and difficult points and solutions of steel structure construction are introduced,the construction schemes of each single structure are described,and the key technologies of Longhuafa Hall reticulated shell structure lifting and the installation technical points under site constraints are explained.Practice has shown that adopting overall lifting schems saves costs and ensures that quatity and installation risks are within a contrllable range.