PBA法地铁车站全过程沉降规律及控制优化研究

扫码查看
以沈阳某地铁车站工程为依托,建立三维数值模型,对PBA法六导洞双跨地铁车站施工全过程沉降规律展开研究,采取相应措施控制地表沉降.研究表明,地表沉降随着施工进度推进而增大,随着与车站中心距离的增大而减小;沉降曲线以车站中线为轴呈对称状态,影响范围为车站中线两侧 40m左右.整个施工阶段导洞开挖对地表沉降的影响最大,扣拱施工次之,两者引发的地表沉降比例高达 89.21%.导洞施工顺序在施工过程中引起的沉降最小;导洞开挖进尺越短对地层扰动越小,施工过程中引起的地表沉降越小.
The Whole Process Settlement Law and Control Optimization of Subway Station by PBA Method
Based on a subway station project in Shenyang,a three-dimensional numerical model was established to study the settlement law of the whole construction process of the six-guide hole double-span subway station with PBA method,and corresponding measures were taken to control the surface settlement.The research shows that the surface settlement increases with the construction progress and decreases with the increase of the distance from the center of the station.The settlement curve is symmetrical with the central line of the station as the axis,and the influence range is about 40m on both sides of the central line of the station.During the whole construction stage,the guide hole excavation has the greatest influence on the surface settlement,followed by the arch construction,and the proportion of surface settlement caused by the both is as high as 89.21%.In the construction process,the settlement caused by the construction sequence is the smallest.The shorter the excavation footage of the guide hole,the smaller disturbance to the stratum,and the smaller surface settlement caused in the construction process.

subway stationsPBA methodguide holeexcavationsettlementdisplacementconstruction

苏志刚

展开 >

中铁二十一局集团轨道交通工程有限公司,山东 济南 250000

地铁车站 PBA法 导洞 开挖 沉降 位移 施工技术

中铁二十一局集团科研计划

202300002

2024

施工技术(中英文)
亚太建设科技信息研究院 中国建筑设计研究院 中国建筑工程总公司 中国土木工程学会

施工技术(中英文)

影响因子:1.244
ISSN:2097-0897
年,卷(期):2024.53(8)
  • 15