施工技术(中英文)2024,Vol.53Issue(8) :116-121.DOI:10.7672/sgjs2024080116

150m跨整孔全焊接钢桁梁试拼装工艺及荷载试验研究

Trial Assembly Technology and Load Test for 150m Span Fully Welded Steel Truss

王杰 彭鹏 黄剑锋
施工技术(中英文)2024,Vol.53Issue(8) :116-121.DOI:10.7672/sgjs2024080116

150m跨整孔全焊接钢桁梁试拼装工艺及荷载试验研究

Trial Assembly Technology and Load Test for 150m Span Fully Welded Steel Truss

王杰 1彭鹏 1黄剑锋1
扫码查看

作者信息

  • 1. 中交第二航务工程局有限公司,湖北 武汉 430040;中交公路长大桥建设国家工程研究中心有限公司,北京 100088
  • 折叠

摘要

孟加拉帕德玛大桥上部为全焊接连续钢桁梁结构,施工中开创性地采用了整孔拼装及架设方案.为验证钢桁梁拼装过程中线形计算及拼装方案的合理性、可行性,选取 1 跨钢桁梁进行试拼装和荷载试验.详细阐述了钢桁梁试拼装前线形计算、整孔试拼装施工技术、荷载试验等相关内容,通过对全过程检测数据及荷载试验分析,验证了该钢桁梁线形计算结果、拼装技术及试验结果均满足要求.

Abstract

The superstructure of Padma Bridge in Bangladesh is a fully welded continuous steel truss,the entire span assembly and erection scheme is adopted creatively in construction.In order to verify the rationality and feasibility of the linear calculation and assembly method,one span steel truss is selected for trial assembly and load test.The linear calculation,the construction technology of the assembly,and the load test for steel truss are elaborated in detail.Through the analysis of the detection data and load test,it is determined that the linear calculation,assembly technology,and test results of the steel truss meet the requirements.

关键词

桥梁工程/钢桁梁/预拱度/焊接/拼装/线形控制/试验

Key words

bridges/steel truss girder/pre-camber/welding/assembling/linear control/tests

引用本文复制引用

出版年

2024
施工技术(中英文)
亚太建设科技信息研究院 中国建筑设计研究院 中国建筑工程总公司 中国土木工程学会

施工技术(中英文)

影响因子:1.244
ISSN:2097-0897
参考文献量6
段落导航相关论文