首页|基于SLP与NSGA-Ⅱ的装配式建筑施工现场临时设施布置多目标优化研究

基于SLP与NSGA-Ⅱ的装配式建筑施工现场临时设施布置多目标优化研究

扫码查看
装配式建筑在现代建筑领域中越来越受关注,有效的临时设施布局对于提高装配效率和降低安全风险至关重要.针对装配式建筑临时设施布局问题,提出了一种基于改进的NSGA-Ⅱ算法的多目标优化方法.首先建立以塔式起重机吊装时间、塔式起重机水平吊装路径长度及与密切程度相关的安全风险的多目标优化数学模型,再采用以SLP法与随机法结合生成初始种群的改进NSGA-Ⅱ算法对模型进行求解.结果表明,所提出的方法能有效减少塔式起重机的吊装时间、缩小吊装范围,并降低与密切程度相关的安全风险.
Multi-objective Optimization of Temporary Facilities Layout of Prefabricated Buildings Based on SLP and NSGA-Ⅱ
Prefabricated buildings have attracted more and more attention in the field of modern architecture.Effective temporary facility layout is crucial to improve assembly efficiency and reduce safety risks.Aiming at the layout problem of temporary facilities in prefabricated buildings,a multi-objective optimization method based on improved NSGA-Ⅱ algorithm is proposed.Firstly,a multi-objective optimization mathematical model of tower crane hoisting time,tower crane horizontal hoisting path length and safety risk related to the degree of closeness is established.Then,the improved NSGA-Ⅱ algorithm,which combines SLP method and random method to generate initial population,is used to solve the model.The results show that the proposed method can effectively reduce the hoisting time of tower crane,narrow the hoisting range and reduce the safety risk related to the closeness.

prefabricatedsite layoutsystematic layout planning(SLP)optimizationliftingrisks

王茹、李秘、伍志豪

展开 >

西安建筑科技大学土木工程学院,陕西 西安 710055

装配式 场地布置 系统布置法 优化 吊装 风险

国家自然科学基金

51978566

2024

施工技术(中英文)
亚太建设科技信息研究院 中国建筑设计研究院 中国建筑工程总公司 中国土木工程学会

施工技术(中英文)

影响因子:1.244
ISSN:2097-0897
年,卷(期):2024.53(10)
  • 15