Key Design Technology for Industrial Space Integration of Double Tees
This paper focuses on the space waste bottleneck commonly encountered in application of mature double tees plate prefabricated structural systems for vertical integration in the context of promoting industrial development in major cities in China.It explores the solution path of supporting technology for longitudinal rib opening layout of mechanical and electrical equipment pipeline routing in double tees components.BIM management methods for architecture,structure,and electromechanical systems are utilized.In the virtual experimental research project,by fully simulating the integration process of architecture,structure,and electromechanical disciplines,a comprehensive integration technology suitable for the double tees structural system is studied and summarized.
building industrializationindustrial superstructuresprefabricationmechanical and electrical integrationlongitudinal rib openingsdouble tees