Construction Technology of High-difficulty Deformation Protection for Large Diameter Sewage Pipe Adjacent to Deep Foundation Excavation
This paper introduces the basic situation and construction challenges of Tianjin Stomatological Hospital Meijiang District expansion project,and then elaborates the construction difficulties analysis,risk assessment,construction technology and measures,construction safety management and environmental protection and other research results.Through redundant design,foundation excavation monitoring,finite element analysis,construction process control,pipeline monitoring and maintenance and other multi-dimensional technical means,the influence of foundation excavation construction on sewage pipes is effectively controlled,and the quality and safety of construction are ensured.
deep foundation excavationsewage piperedundant designfinite element analysismonitoringconstruction