Application of BIM-based Green Intelligent and Efficient Construction in a Multi-story and Large-span Steel Structure Engineering
The steel structure construction of Shihezi Convention and Exhibition Center project mainly focuses on the part of the conference center.During the construction process,there are the difficulties such as high precision requirements of beam-column node construction,difficulty in lifting large steel components,small construction site and tight schedule.In order to solve the above problems,BIM technology was introduced to deepen the design and construction process simulation of the steel structure of the convention center.The advantages of BIM technology are verified through the actual construction of the project.The results show that the application of BIM technology to deepen the design of steel structure can significantly reduce the rate of steel loss in the production stage and effectively reduce the collision problems of beam-column nodes.The construction simulation using BIM 4D has unique advantages in construction progress control,key construction technology simulation and so on.The introduction of BIM technology realizes the high quality construction of the project,and the project achieves the goals of zero accident rate,zero rework rate and 100%pass rate.
steel structureslarge spanbuilding information modeling(BIM)detailed designconstructionsimulation