To improve the technical level of the main construction of urban drainage network construction and urban waterlogging sites control projects,this paper used actual engineering projects in the central urban area of Zunyi City as as a case study.It conducted an assessment of the current situation of urban drainage network construction and the risk of waterlogging points,and proposed optimized technical methods for the main construction part of the projects.The results show that understanding the operational limitations of the drainage network and the extent of waterlogging risks is beneficial for strengthening the construction effects in weak areas and enhancing the reliability of the management facilities.
关键词
城区排水管网/内涝点治理工程/主体施工/管道安装
Key words
urban drainage network/waterlogging sites control project/main construction/pipeline installation