上海建材2024,Issue(5) :113-116.DOI:10.3969/j.issn.1006-1177.2024.05.027

长距离顶管施工技术在市政给排水施工中的运用

Application of Long-Distance Pipe Jacking Construction Technology in Municipal Water Supply and Drainage Engineering

蔡国圈
上海建材2024,Issue(5) :113-116.DOI:10.3969/j.issn.1006-1177.2024.05.027

长距离顶管施工技术在市政给排水施工中的运用

Application of Long-Distance Pipe Jacking Construction Technology in Municipal Water Supply and Drainage Engineering

蔡国圈1
扫码查看

作者信息

  • 1. 厦门市政特水工程有限公司,福建 厦门 361000
  • 折叠

摘要

近年来,我国所规划落实的市政工程项目增多,同时建设要求也不断提高.这就需要施工单位能够充分考虑市政工程建设特点、施工现场实际情况及相关规范要求,选择适合的施工技术,以便规范施工,达成预期建设目标.针对市政给排水工程建设,选择长距离顶管施工技术,可以满足实际需求,降低施工难度和施工成本,并且施工操作简单.基于此,本文结合工程案例,着重分析和探讨市政给排水施工中长距离顶管施工准备及施工技术的应用要点,希望能够为相关人士提供参考.

Abstract

In recent years,there has been a rising number of municipal engineering projects planned and implemented in China,in the meantime,higher construction requirements have been set up.This requires construction units to comprehensively consider the characteristics of municipal engineering construction,the actual situation of construction sites,and relevant regulatory requirements to select suitable construction technologies that ensure standardized construction and achieve expected construction goals.In the field of municipal water supply and drainage engineering construction,choosing long-distance pipe jacking construction technology is very suitable as it meets practical needs while reducing construction difficulty and costs,and simplifies construction operations.Considering the above,this paper combined with engineering cases,focused on analyzing and exploring the key points of preparation and construction technology application for long-distance pipe jacking construction in municipal water supply and drainage construction,and providing references for relevant professional personnel.

关键词

市政给排水工程/长距离/顶管/技术要点

Key words

municipal water supply and drainage engineering/long-distance/pipe jacking/technical key point

引用本文复制引用

出版年

2024
上海建材
上海市建材科技情报研究所

上海建材

影响因子:0.269
ISSN:1006-1177
段落导航相关论文