首页|煤层带压开采的实践与分析

煤层带压开采的实践与分析

扫码查看
奥灰水的对煤矿得到安全生产由极大的影响,根据对老窑沟矿煤层带压情况的安全论证,提出了"综合防治,带压开采"的技术方案.根据断层煤柱留设后可布置工作面长度,2#煤 20203 工作面为最长 145 m;5#煤最长120 m,并对矿井排水能力进行了验证,进一步确定了带压开采的可行性.
Practice and Analysis of Coal Seam Pressure Mining
The safety production of coal mines is greatly affected by the use of Ordovician limestone water.Based on the safety demonstration of the pressure situation in the coal seams of Laoyaogou Mine,a technical scheme of"comprehensive prevention and control,pressure mining"is proposed.After setting up the fault coal pillar,the length of the working face can be arranged,with a maximum length of 145 meters for the 20203 working face of coal#2.The maximum length of 5#coal is 120 meters,and the drainage capacity of the mine has been verified,further confirming the feasibility of pressurized mining.

pressurized miningOrdovician limestone waterdrainage capacity

彭镜达

展开 >

山西宁武大运华盛能源集团有限公司, 山西 忻州 036700

带压开采 奥灰水 排水能力

2024

山西化工
山西省煤化工发展促进中心 山西省化工学会

山西化工

影响因子:0.293
ISSN:1004-7050
年,卷(期):2024.44(1)
  • 4