山西化工2024,Vol.44Issue(2) :190-191,215.DOI:10.16525/j.cnki.cn14-1109/tq.2024.02.071

综采工作面安装拆除现状及改进方法研究

Research on the Current Situation and Improvement Methods of Installation and Demolition in Fully Mechanized Mining Faces

李大为
山西化工2024,Vol.44Issue(2) :190-191,215.DOI:10.16525/j.cnki.cn14-1109/tq.2024.02.071

综采工作面安装拆除现状及改进方法研究

Research on the Current Situation and Improvement Methods of Installation and Demolition in Fully Mechanized Mining Faces

李大为1
扫码查看

作者信息

  • 1. 汾西矿业集团高阳煤矿, 山西 孝义 032300
  • 折叠

摘要

为提高综采工作面安装与拆除出成效,本文探讨工作现状,如安装和拆除环境复杂、安装和拆卸空间、工具比较落后等,提出具体的改进方法,不但可以提高了作业面的总体水平,而且能够减少各类隐患,提升安全作业成效,以期为相关人员提供参考.

Abstract

In order to improve the efficiency of installation and dismantling of fully mechanized mining faces,this article explores the current situation of work,such as complex installation and dismantling environments,outdated installation and dismantling spaces,and tools.Specific improvement methods are proposed,which not only improve the overall level of the working face,but also reduce various hidden dangers and improve safety operation efficiency,in order to provide reference for relevant personnel.

关键词

综采工作面/安装/拆除

Key words

fully mechanized mining face/installation/dismantle

引用本文复制引用

出版年

2024
山西化工
山西省煤化工发展促进中心 山西省化工学会

山西化工

影响因子:0.293
ISSN:1004-7050
参考文献量5
段落导航相关论文