首页|综采工作面过断层围岩控制技术研究

综采工作面过断层围岩控制技术研究

扫码查看
为了解决煤矿综采工作面存在的安全隐患问题,需要对工作面过断层围岩控制技术进行合理应用.基于此,本文结合某综采工作面案例展开分析,结合实际过断层地质条件情况,提出注浆加固设计方案,采取注浆加固效果数值模拟分析,最终保证综采工作面过断层的加固工作效果,为后续的煤矿安全开采工作打下良好的基础,同时希望可以为相关工作开展提供有效参考.
Research on Control Technology of Surrounding Rock Passing Through Faults in Fully Mechanized Mining Face
In order to solve the safety hazards of coal mine fully mechanized mining faces,it is necessary to apply reasonable control technology for the surrounding rock passing through faults in the working face.Based on this,this article combines a case study of a fully mechanized mining face and proposes a grouting reinforcement design scheme based on the actual geological conditions of the fault crossing.Numerical simulation analysis of the grouting reinforcement effect is adopted to ultimately ensure the reinforcement effect of the fully mechanized mining face crossing the fault,laying a good foundation for subsequent coal mine safety mining work.At the same time,it is hoped that this can provide effective reference for related work.

coal minefully mechanized mining facepassing through faultssurrounding rock control

郭俊斌

展开 >

山西汾西矿业(集团)有限责任公司安全监察中心,山西 介休 032000

煤矿 综采工作面 过断层 围岩控制

2024

山西化工
山西省煤化工发展促进中心 山西省化工学会

山西化工

影响因子:0.293
ISSN:1004-7050
年,卷(期):2024.44(8)