Long Term Stable and Efficient Production Practice of Tangshan Iron and Steel No.2 Blast Furnace
Long term stable and smooth operation is the goal pursued by blast furnace ironmaking.After the No.2 blast furnace of Tangshan Iron and Steel was put into operation,measures such as optimizing the burden structure,improving the quality of raw materials,optimizing the operating system of the blast furnace,and strengthening management were taken.The daily output of the blast furnace was over 8 800 t/d,with a utilization coefficient of 3.0 t/m3,achieving long-term stable and efficient production of the blast furnace.
blast furnacestable and smooth flowfurnace material structureefficient production