为了合理规划煤矿开采设计,最大限度回收煤炭资源,进一步加强矿井资源量管理,以晋能控股煤业集团四侯煤矿为研究背景,对其资源量进行估算,对资源量变化情况进行对比分析.经估算,全井田累计查明资源量82570 kt,保有资源量61397 kt,动用资源量21173 kt.该估算结果可为矿井下一步开采设计提供数据依据.
Estimation and Comparative Analysis of Coal Mine Geological Resources
In order to plan coal mining design reasonably,maximize coal resource recovery,and further strengthen mine resource management,this study takes the Sihou Coal Mine of Jinneng Holding Coal Industry Group as the research background,estimates its resource quantity,and compares and analyzes the changes in resource quantity.According to estimates,the total identified resources in the entire mining area are 82570 kt,with a total of 61397 kt of retained resources and 21173 kt of utilized resources.The estimate result provides a data basis for the next mining design of the mine.

coal minegeological resourcesestimatecomparative analysis

段文婷

展开 >

晋能控股煤业集团地测勘探有限公司,山西 大同 037001

煤矿 地质资源 估算 对比分析

2024

山西冶金
山西省金属学会 山西省有色金属学会

山西冶金

影响因子:0.139
ISSN:1672-1152
年,卷(期):2024.47(4)
  • 5