Practice of Shortening Smelting Cycle in 120 ton Converter
With the gradual increase in iron production,the production capacity of the converter at Delong Steelmaking Plant cannot meet the needs of the continuous casting machine,and problems such as hot metal accumulation in the blast furnace,interweaving of two converters,and frequent fluctuations in continuous casting speed often occur,which brings great difficulties to the production organization and poses potential risks to product quality.In response to this situation,combined with the existing production conditions of Delong Steel Steelmaking Plant,the factors affecting the converter smelting cycle were analyzed,and targeted improvement measures were proposed and implemented to achieve the goal of shortening the converter smelting cycle and maximizing production capacity benefits.
120 ton convertersmelting cycleprocess optimizationmaximizing production capacity