Energy Consumption Analysis of Adding Flue Gas Purification System to Blast Furnace Hot Blast Stove
In order to meet the emission limit requirements of the steel coking industry,Shanxi Taigang Stainless Steel Co.,Ltd.has constructed a new set of flue gas purification system with a processing capacity of 500 000 m 3/h for desulfurization treatment in the sixth BF hot blast furnace.Energy consumption analysis is conducted on the main energy consumption processes of the project.Practice has shown that this project meets the requirements of the reasonable energy use standards and energy-saving design specifications in the Outline of China's Energy Conservation Technology Policy.