山西冶金2024,Vol.47Issue(6) :185-186.DOI:10.16525/j.cnki.cn14-1167/tf.2024.06.065

铜矿峪矿二期工程聚矿沟掘进及支护施工工艺改进

Improvement of Mining Ditch Excavation and Support Construction Technology for Phase ⅡProject of Tongkuangyu Mine

刘凯
山西冶金2024,Vol.47Issue(6) :185-186.DOI:10.16525/j.cnki.cn14-1167/tf.2024.06.065

铜矿峪矿二期工程聚矿沟掘进及支护施工工艺改进

Improvement of Mining Ditch Excavation and Support Construction Technology for Phase ⅡProject of Tongkuangyu Mine

刘凯1
扫码查看

作者信息

  • 1. 山西北方铜业有限公司铜矿峪矿,山西 垣曲 043700
  • 折叠

摘要

为解决铜矿峪矿二期工程传统设计出矿水平聚矿沟施工中存在的问题,通过外出考察,积极引进CY-40C切割槽大孔钻机进行工艺改进,同时还提出了今后还可继续改进的方向,以助于铜矿峪矿向高端化、智能化方向发展.

Abstract

In order to solve the problems in the traditional design of the mining horizontal gathering ditch construction of the Phase Ⅱ project of Tongkuangyu Mine,through external inspections,the CY-40C cutting groove large hole drilling rig was actively introduced for process improvement.At the same time,directions for further improvement were proposed to help Tongkuangyu Mine develop towards high-end and intelligent direction.

关键词

聚矿沟/槽井/切割槽大孔/一次成井

Key words

ore accumulating trench/channeling wells/cutting slots with large holes/one-time well completion

引用本文复制引用

出版年

2024
山西冶金
山西省金属学会 山西省有色金属学会

山西冶金

影响因子:0.139
ISSN:1672-1152
参考文献量1
段落导航相关论文