Practice of Gas Flow Control in Shaogang No.8 Blast Furnace Pipeline
After changes in raw materials occurred in No.8 blast furnace of Shaoguan Iron and Steel,the furnace operation was not adjusted in a timely manner,resulting in fluctuations in furnace conditions and frequent pipeline airflow.To address this problem,by analyzing the main reasons for furnace condition fluctuations,processes such as stabilizing raw material quality,adjusting loading system,strengthening furnace temperature control,and enhancing slag and iron emissions were adopted to adjust,further deterioration of furnace conditions is avoided and smooth furnace conditions are restored in a relatively short period of time,achieving good results.
blast furnacepipeline airflowprocess adjustmentstable and smooth sailing