Discussion on Feasibility of Adding Converter Steel Slag to Sintering System
Tangshan Medium Thick Plate Company,under the existing material conditions of the company,takes into account factors such as steelmaking and ironmaking costs,environmental protection,and actual production situation.Different proportions of converter steel slag are added during the sintering process,and the influence of sintering cost,blast furnace iron composition,and subsequent steelmaking cost is analyzed.The optimal proportion of converter steel slag added during sintering is determined to meet the w(P)upper limit requirement of the company's iron.In the future,it will continue to optimize the sintering and blast furnace ore blending structure,find the optimal balance between cost and composition,and provide practical experience.