首页|炼铁厂2号脱硫塔除雾器压差问题研究及处理

炼铁厂2号脱硫塔除雾器压差问题研究及处理

扫码查看
炼铁厂2号脱硫塔除雾器运行过程中压差持续升高,烟囱出口下"石膏雨",对烧结机系统的正常生产和周围环境造成很大影响.针对压差问题,从工艺参数操作、设备运行情况等方面进行研究分析,制定出相应的解决方案措施,确保脱硫塔设备稳定顺行.
Treatment and Research on Pressure Difference of No.2 Desulphurization Tower Mist Eliminator in Ironmaking Plant
The pressure difference of the mist eliminator of No.2 desulphurization tower in ironmaking plant increases continuously during operation,and"Gypsum Rain"under the chimney outlet has a great effect on the normal production of the sintering machine system and the surrounding environment.In view of the pressure difference,this paper studies and analyzes the operation of the process parameters and the operation of the equipment,and formulates the solution measures to ensure the stable and smooth running of the desulphurization tower equipment.

desulfurization towermist eliminatorpressure differencegypsum rain

马晋

展开 >

酒钢集团宏兴股份公司炼铁厂,甘肃 嘉峪关 735100

脱硫塔 除雾器 压差 石膏雨

2024

山西冶金
山西省金属学会 山西省有色金属学会

山西冶金

影响因子:0.139
ISSN:1672-1152
年,卷(期):2024.47(11)