The Solution and Preemptive Measures of Drill Pipe Incidents in Tongkuangyu Copper Mine
From 2020 to 2022,during the research project on the application of hydraulic fracturing rock pretreatment technology in Tongkuangyu mine,multiple top drilling accidents occurred,causing equipment damage and project delays,greatly affecting the smooth progress of the project.Based on the working principle of hydraulic fracturing and rock breaking technology,the causes of top drilling accidents were analyzed.By summarizing the handling experience,preventive measures were proposed,which can provide reference and inspiration for future hydraulic fracturing work.
hydraulic fracturingtop drilling accidentaccident handling and prevention