Taking the workshop construction in salt lake area as an example,according to its weather conditions and engineering geology condi-tions,the paper introduces in-plant pipeline material selecting methods,and analyzes pipeline design points and connecting measures,with a view to reduce pipeline leakage and improve the workshop safety and stability.