On key construction techniques of deep seated slide-resistant pile along Beijing-Kowloon Railway
With the example of K2038+700—K2038+800 fossil landslide along Beijing-Kowloon Railway,the paper is designed to adopt the integrated harnessing measures with the deep seated slide-resistant pile and underground drainage by desiccation system,applies some key construction techniques,including the advanced small pipe grouting,the reinforce-ment of abutment at slip zonesand well point dewatering to solve the possible diseases such as water-mud bursting and cracks on abutments in the construction process,and illustrates the construction of the deep seat slide-resistant pile can be completed safely and efficiently by combining with the key technique of the monitoring measurement,so as to provide some engineering experience for the construction of the similar deep seated slide-resistant piles in the railway construction.
Beijing-Kowloon Railwayfossil landslidedeep seated slide-resistant pileskey construction techniquemo-nitoring measurement