Research on construction accuracy control of assembled and stacked integrated underground station main structure
In the construction process of the main structure of the assembled and stacked integrated underground station,in order to achieve a tight fit,beautiful structure,reduce structural leakage,and improve the construction quality of the assembled and stacked integrated underground station.Through the analysis and research of key processes in the assembly process,relevant control measures have been developed to improve the prefabrication accuracy,measurement accuracy,installation accuracy,and embedded component positioning accuracy of concrete components.These measures have been applied in practice and have achieved good results,further promoting the development of underground assembly composite structures.