工法桩盾构始发接收洞门处置施工措施
Tunnel entrance processing measures between shield originating and receiving of SMW
孙圣斌1
作者信息
- 1. 中铁十五局集团有限公司,上海 200000
- 折叠
摘要
盾构始发接收为盾构隧道施工工法的重难点,工法桩围护结构作为盾构始发接收洞门增加了该工序的施工风险,针对此,分析了盾构接收施工中存在的风险,介绍了工法桩围护结构施工洞门的措施以及接收方法,从而加强了盾构施工安全性,减少盾构施工约束性,保证盾构接收顺利完成.
Abstract
As a matter of fact,shield originating and receiving is a critical and difficult point in shield tunneling construc-tion.However,SMW enclosure structure is regarded as the shield originating and receiving tunnel entrance,which increa-ses its construction risk.Based on the above-mentioned construction conditions,the paper analyzes risks existing in shield originating and receiving process,introduces the tunnel entrance processing measures and receiving methods of SMW en-closure structure.As a result,it not only strengthens the shielding construction safety,but also reduces shielding con-struction limit,and ensures smooth shield receiving as well.
关键词
工法桩/盾构始发接收/渗漏水/侧向变形Key words
SMW(Soil Mixed Wall)/shield originating and receiving/water leakage/lateral deformation引用本文复制引用
出版年
2025